Carousel

80

How Apache Industrial Solved Buddy Badging for 6,000 Field Employees

CASE STUDY

How Apache Industrial Stopped Buddy Badging, Proved On-Site Presence, and Built an AI-Ready Timekeeping Foundation

LOCATION

Houston, Texas with 40+ locations across North America

CONTRACTOR TYPE

Specialty

TRADE

Scaffolding, Insulation, Coatings and Linings, Fireproofing, Painting, Abatement

NO. OF EMPLOYEES

6000 field | 200 office

INTEGRATIONS
logo procore
InOne_Logo.jpg-removebg-preview

Apache

…
76

How Western Partitions Scaled Jobsite Accountability Across 500 Projects

CASE STUDY

How Western Partitions Brought Jobsite Accountability to 400–500 Projects a Year With Verified Clock-Ins and Faster Field Communication

LOCATION

Wilsonville, Oregon

CONTRACTOR TYPE

Specialty

TRADE

Drywall, Framing, Lath and Plaster, Fireproofing

NO. OF EMPLOYEES

+1.000

INTEGRATIONS
674a0b07efd1a37b51378f06_631a924c4dbf9bd20c9966cc_603450f29aeb94ab166a11f4_viewpoint-vista

Nate Philbrick is the Construction Systems Manager at Western Partitions,

…
77

Prism Electric: From Rounded Timecards to Decision-Grade Field Data

CASE STUDY

How Prism Electric Replaced “Rounded” Timecards With Reliable Data, Stronger Accountability, and Weekly Payroll Confidence

LOCATION

Texas

CONTRACTOR TYPE

Specialty

TRADE

Electrical

NO. OF EMPLOYEES

2.000

INTEGRATIONS

Luke Harmon is the Executive Vice President at Prism Electric, a commercial and industrial electrical contractor operating across Texas

…
The Newtron Group data center construction time tracking case study

How a Union Electrical Contractor Scaled Data Center Projects While Cutting Payroll Processing Time by 20%

CASE STUDY

How a Union Electrical Contractor Scaled Data Center Projects While Cutting Payroll Processing Time by 20%

reduction in payroll processing times
0 %
cut in payroll corrections
0 %
weeks for implementation
0
accurate time-tracking
0 %
LOCATION

Baton Rouge, Louisiana

CONTRACTOR TYPE

Specialty

TRADE
…
DSI & SmartBarrel Case Study Hero Image

How DSI Took Control of Time Tracking and Reclaimed $2.6M in Overreported Labor Hours

CASE STUDY

How DSI Took Control of Time Tracking and Reclaimed $2.6M in Overreported Labor Hours

recovered from overreported hours
$ 0 M
saved in super/foreman admin time
$ 0 K/yr
active jobsites using SmartBarrel
0 +
real-time field visibility achieved
0 %
LOCATION

Austin, Texas

CONTRACTOR
…
IMG_1635

How Thalle Reduced Payroll Processing time by 97% and Improved Work-Life Balance

CASE STUDY

Slashing Payroll Processing from 2 Hours to 5 Minutes and Improving Work-Life Balance

faster payroll processing
0 %
payroll processing for all jobs
0 hr
projects up and running
0
payroll processing for large jobs
0 min
LOCATION

Hillsborough, North Carolina

CONTRACTOR TYPE

Specialty

TRADE

Heavy Civil

…

How Karsten Interior Services Cut Payroll Errors by 90% While Doubling Workforce

CASE STUDY

How Karsten Interior Services Cut Payroll Errors by 90% While Doubling Workforce

fewer weekly payroll corrections
0 %
reclaimed per week per foreman
0 hrs
growth in field workers
0 X
person payroll team members for 1000+ workers
0
LOCATION

Houston, Texas

CONTRACTOR TYPE

Specialty

TRADE
…
82

How NexGen Ditched Excel and Paper for Verified Field Timekeeping

CASE STUDY

How NexGen Replaced Excel + Paper Timekeeping With Verified Clock-Ins and Cleaner Payroll Workflows

LOCATION

Franklin, Tennessee

CONTRACTOR TYPE

Specialty

TRADE

Concrete, Steel Erection, Millwright, Piping

NO. OF EMPLOYEES

700

INTEGRATIONS
ERP

Scotty Davis is the Project Services Lead at NexGen, the self-perform arm of Gray

…

How RBD Construction Saved $871,000 a Year in Overtime Overpayments

CASE STUDY

How RBD Construction Saves $871,000 a Year in Overtime Overpayments With Verified Clock-Ins

Reduction in overtime hours in the first week
0 %
saved in 1 year
$ 0 K
accurate & fully-automated per diem calculations
0 %
full day eliminated payroll admin time
0
…

How General Asphalt Eliminated 35 Hours of Admin Work per Week

CASE STUDY

How General Asphalt Eliminated 35 Hours of Admin Work per Week

hours of manual admin work eliminated per week
0
elimination of paper timesheets
0 %
hours a week recovered from calling foremen and fixing errors
0
field employees now running one time tracking system
0 +
…
SB Thumbnails-12

How Ogden Brothers Construction Eliminated 1,040 Hours of Manual Cost Code Correction

CASE STUDY

How Ogden Brothers Construction Eliminated 1,040 Hours of Manual Cost Code Correction & Data Entry

LOCATION

Fort Myers, FL

CONTRACTOR TYPE

Specialty

TRADE

Concrete, Masonry, Structural Steel, Tilt-Wall

NO. OF EMPLOYEES

260+

INTEGRATIONS

About Ogden Brothers Construction

Founded in 2005 in Fort Myers, Florida, Ogden Brothers

…
Jenco & SmartBarrel Case Study Hero Image

How JENCO Reclaimed 60 Hours a Week and Cut a Full Day from Payroll

CASE STUDY

How JENCO Reclaimed 60 Hours a Week and Cut a Full Day from Payroll

of foremen time saved per week
0 hrs
saved in payroll and foremen admin time
$ 0 K/yr
saved per week processing payroll
0 hrs
reduction in payroll re-runs
0 %
LOCATION
…