Data Center Construction Time Tracking

Capture 100% Accurate Timecards on Data Center Construction Projects

SmartBarrel is a biometric time tracking solution built for data center construction. Easily track hours and cost codes across thousands of workers on mission critical projects.

SmartBarrel timesheet dashboard, mobile facial verification, and a jobsite time clock on a data center construction site

Trusted by Contractors Building the next wave of data centers

SmartBarrel supports crews in all 50 states, including the major data center markets: Northern Virginia, Columbus, Phoenix, Atlanta, and Dallas.

Time Tracking in Data Centers

The Traditional Way vs. SmartBarrel

Hyperscale and colocation data center sites run hundreds of craft workers, round-the-clock shifts, and complex per diem and incentive tracking, and the pressure only builds as the job moves toward commissioning. More on why time tracking gets so hard at scale.
Here’s what changes when your crew switches to verified time.

Traditional time tracking compared with SmartBarrel on data center construction projects

The Traditional Way

SmartBarrel

Paper sign-in sheets result in missed time or inaccurate time.

Flexible check-in options with facial verification gives you the most accurate time instantly.

Hours get rekeyed into the ERP by hand, and errors follow.

Structured data flows straight to payroll, automatically.

No way to confirm who's actually on site across shifts.

AI facial verification confirms who is onsite, every shift.

Cost codes aren't specific to a single job. Missing or inaccurate cost codes lead to unreliable job costing.

Cost codes and classification are specific to the job and easily assigned by foremen in the field.

Payroll spends too much time chasing down and fixing hours. Overtime rules are applied manually.

Payroll has the most accurate time with all overtime rules already applied.

Buddy punching goes undetected across large crews.

Every punch is tied to a verified identity using biometric facial verification. No buddy punching or ghost punching.

Incentive tracking done manually.

Incentive rules are built-in and automatically applied.

Accurate time, captured at the source

Data center construction runs on large craft crews, day and night shifts, and constant shift turnover as the job moves from shell to commissioning. SmartBarrel can handle it all.

  • No manual entry or foremen-entered hours
  • Facial verification confirms the right worker
  • See the data on the dashboard in real time
  • Auditable, defensible timesheets for T&M billing, back-charges, and labor disputes, every edit logged
Construction worker clocking in on a SmartBarrel time clock inside a data center, with a timesheet showing verified punch times and billable hours

Simple enough crews will actually use it

Workers type their phone number, take a picture and are clocked in. Construction teams get moving on day one without a training session.

  • Punch in time takes under 3 seconds 
  • No training required
  • Works with PPE like gloves, hard hats, safety glasses 
  • Flexible check in options: portable time clock, kiosk app, and personal app all work the exact same way
  • Workers receive a text message confirming their hours
Data center construction worker clocking in on a SmartBarrel time clock and on the mobile app, with a confirmation showing verified face, cost code, and location

Track cost codes & productivity

Assign cost codes and classifications in the field tied to verified time, not days later in the office. 

  • Foremen assign cost codes in seconds
  • Apply craft labor classifications for union, prevailing wage, and certified payroll work
  • Add production quantities installed
  • See productivity metrics like budgeted vs. actual hours, earned hours, forecasted hours and more.
SmartBarrel timesheet assigning labor cost codes, quantities, and hours to each worker on a data center project

Give payroll teams timecards they can trust

Workers check in at the source. Foremen assign cost codes and approve time daily. The result? Payroll gets 100% accurate data, every time, and job costing stays aligned with project timelines. 

  • Slash 800+ hours of manual entry every year
  • Reduce payroll errors and eliminate reruns
  • Submit hours tied to correct cost code for job costing
  • Stop payroll disputes before they happen
Construction crew on a jobsite with verified SmartBarrel punch-in records showing biometric and geofence verification and cost codes

Seamless integrations

SmartBarrel integrates with virtually any construction software on the market, including:

Construction software SmartBarrel integrates with, including Procore, CMiC, Viewpoint, Sage, Foundation, and Plexxis

DATA CENTER CASE STUDY

How The Newtron Group Scaled Data Center Projects While Cutting Payroll Processing Time by 20%

The Newtron Group data center construction time tracking case study

From paper timecards and foremen-time entry to verified, audit-ready hours

The Newtron Group is one of the largest privately owned industrial electrical contractors in the country, and a union shop running crews across multiple data center projects at once. With SmartBarrel, they eliminated buddy punching and time theft with 100% accurate hours from the field.

20%

Faster payroll processing

25%

Less manual data entry

6

Data center projects, 3-week rollout

“Using SmartBarrel for our  projects has been a fantastic experience. The system is super straightforward, even for large crews spread across multiple sites. It’s truly a construction manager’s best friend.”

Praneeth Gali, IT Infrastructure Engineer, Newtron Group

Data Center Construction Time Tracking is Just the Start

Capture accurate hours with the TimeClock 4.0 or SmartBarrel mobile app. Verified clock-ins flow into your dashboard that includes cost code tracking, productivity analytics, expense management and more.

SmartBarrel TimeClock 4.0, mobile app, timesheet, and productivity dashboard shown as one connected workflow

The Hardware

Portable time clock with biometric facial verification and GPS tracking. Lives on your jobsite. No charging required, no setup, no excuses.

The Mobile App

Worker-facing construction mobile app for iOS and Android. Simple clock-in with phone number and picture. 

The Dashboard

Full visibility and control over every jobsite in real-time. Manage labor hours, absenteeism, cost codes, productivity, daily logs and more. 

Additional Construction Time Keeping Features

Expense Management

Track per diem, travel pay, mileage, truck allowance and reimbursements.

Geofence Tracking

Add boundaries around every jobsite so workers only clock in when there.

Daily Logs

Automate your daily logs. Eliminate manual paperwork forever.

Safety Tracking

Scan for PPE, manage incident reports, check safety training progress and more.

broadcast

Broadcasting

Message your entire field crew instantly with important announcements.

Time and Break Rules

Set clock-in, clock-out, time rounding, and break rules. Done.

Union Compliance

Automatically comply with union shift and break rules. No more spreadsheets.

Temp Labor & Hourly Sub Tracking

Track employees, temp workers, and hourly subcontractors together.

Automatic OT / DT

Automatically calculate overtime and doubletime. No manual math.

Labor Cost Codes

Track labor cost codes in real-time across jobsites and projects.

Shift Approval

Full control over shift approvals before processing payroll.

Hear From Contractors Thriving with SmartBarrel

timecard approval
SOLAR

“With SmartBarrel, we've reached a 90% approval rate for time tracking, a massive improvement from our previous methods. This level of accuracy and speed in approvals has greatly reduced our administrative burden and resulted in significant savings”

Michael Cottle

PROJECT EXECUTIVE

LPL SOLAR

Syber Concrete Forming - Project Brentwood Town Centre
CONCRETE

“Payroll processing only takes me two hours per week at most. Before SmartBarrel, I used to spend an extra 12 hours since manual time entry always had discrepancies. We've cut payroll errors by 20% to 30% because I was manually entering time before, and now I just review one file.”

Patty Horvath

CAO

SYBER CONCRETE FORMING LTD.

31-CMS-Quaker-Completed-New-Tank-Farm-1-e1686589640723
MECHANICAL

“SmartBarrel’s implementation and rollout went incredibly smoothly. One of the biggest wins was how easy it was to train our field employees, even those who aren’t very comfortable with technology. The system is easy-to-use and has helped improve accuracy and accountability.”

Brady Hobbs

STRATEGIC BUSINESS ANALYST

COMPLETE MECHANICAL SERVICES LLC.

jenco3
ELECTRICAL

“It takes foremen 5 to 10 minutes to approve time at the end of the day or the next morning. As a result, payroll is no longer a fire drill. We’re not having to do double runs of payroll on Friday anymore. That in itself is amazing.”

Jen Meacham

DIRECTOR, TALENT & REGIONAL HR

JENCO, INC.

North Lake Houston Shop Facility (1).png
SCAFFOLDING

“We had over 1000 workers but no standardized system for time capture. With SmartBarrel, we now have complete visibility, even for projects hundreds of miles away. We can see who is onsite, what cost codes were performed, all in real time. We can then convey this information to clients and it settles disputes before they arise.”

Jason Barron

DIRECTOR OF PROJECT CONTROLS

APACHE INDUSTRIAL SERVICES

schedule of values (2)
ELECTRICAL

“SmartBarrel is super straightforward, even for large crews spread across multiple sites. It streamlines the entire payroll process, significantly reduced administrative headaches, and syncs with our existing project management software. It's truly a construction manager's best friend!”

Praneeth Gali

IT INFRASTRUCTURE ENGINEER

NEWTRON LLC

about-2
ELECTRICAL

“Paper timesheets were a huge time suck and we had over 700 workers submitting them every week. To fix this, we needed a hardware solution for jobsites. SmartBarrel transformed timekeeping from a foreman’s responsibility to the employee’s. Now, we get hours that are always accurate – upfront. It gives us reliable data to make better decisions.”

Luke Harmon

CEO

PRISM ELECTRIC

Data Center Construction Time Tracking FAQ

How does SmartBarrel handle hundreds or thousands of craft workers on a data center project?

SmartBarrel is built for high-volume jobsites. Your workers punch in on rugged biometric time clocks or the mobile app in seconds, and every punch is verified with facial verification. Supervisors see real-time headcount by crew, foreman, area, and shift in one dashboard, so you always know where your workforce is across every pad, building, and phase of the project.

Yes. SmartBarrel complements existing site security. Geofence rules ensure workers can only clock in on site, and biometric verification confirms the person punching is who they say they are. The result is a verified, defensible record of your crew’s hours: the documentation you need for T&M billing, back-charges, labor disputes, and audits.

Same day. The portable time clocks are solar or battery powered with built-in LTE, magnetic-mount, and weatherproof, so no site power, network drops, or IT involvement required. They move with the work across large construction sites, from pads to gates to laydown areas, as the project evolves. SmartBarrel supports crews in all 50 states, including the major data center markets: Northern Virginia, Columbus, Phoenix, Atlanta, and Dallas.

Yes. Crews or foremen assign cost codes at punch-in or during the shift, and verified craft labor hours roll up by building, level, scope, or phase. Production quantities can be logged against the same codes, giving you real-time earned-vs-burned visibility across the campus.

SmartBarrel integrates with Procore, CMiC, Viewpoint, Plexxis, Foundation, Sage, ComputerEase, QuickBooks and more, plus an API for custom stacks. Verified time and cost codes flow to the systems your PMs and payroll teams already use.

Per diem, mileage, and truck allowance are tracked against verified punches, so travel and subsistence pay is tied to the days your crew was actually on site. Rules are built in and applied automatically instead of being reconciled by hand, and the amounts flow to payroll alongside the hours.

SmartBarrel captures the field data certified payroll depends on: verified hours by worker, classification, and cost code, with every edit logged and auditable. Foremen assign classifications in the field for union and prevailing wage work, so the data reaches your payroll system already attributed instead of being reconstructed after the fact.

SmartBarrel is priced per worker per month, plus a monthly rate for each TimeClock device on your jobsites, with a 100-worker minimum billed annually. Because data center projects vary widely in crew size and how many clocks you need across pads and gates, request a demo for a quote scoped to your project.