Case Study

DSI & SmartBarrel Case Study Hero Image

How DSI Took Control of Time Tracking and Reclaimed $2.6M in Overreported Labor Hours

CASE STUDY

How DSI Took Control of Time Tracking and Reclaimed $2.6M in Overreported Labor Hours

recovered from overreported hours
$ 0 M
saved in super/foreman admin time
$ 0 K/yr
active jobsites using SmartBarrel
0 +
real-time field visibility achieved
0 %
LOCATION

Austin, Texas

CONTRACTOR
Complete Mechanical & SmartBarrel Case Study Hero Image

Complete Mechanical Cut Payroll Time by 80%, Saving 2.5 Days a Week With Verified Time Tracking

CASE STUDY

Complete Mechanical Cut Payroll Time by 80%, Saving 2.5 Days a Week With Verified Time Tracking

faster payroll processing
0 %
annual savings from verified hours
0 K
hours saved per super per week
0 hrs
reduction in payroll errors
0 %
LOCATION

Cincinnati, Ohio

CONTRACTOR
WPI & SmartBarrel Case Study Hero Image

How WPI Reduced Payroll Processing Time by 60% and Achieved 100% Error-Free Reporting

CASE STUDY

How WPI Reduced Payroll Processing Time by 60% and Achieved 100% Error-Free Reporting

of timesheet errors eliminated
0 %
reduction in timesheet verification time
0 %
reduction in the payroll approval process
0 %
ROI on SmartBarrel Investment
0 %
wpi-builds-logo
LOCATION

Headquartered in Portland, OR,

Harper Electric & SmartBarrel Case Study Hero Image

Harper Electric Slashes Manual Time Entry by 70% with AI-Powered Biometric Timekeeping Solution

CASE STUDY

Harper Electric Slashes Manual Time Entry by 70% with AI-Powered Biometric Timekeeping Solution

Reduction in Payroll Errors
0 %
Manual data entry eliminated
0 %
Reduction in payroll processing time
0 %
Hours saved per week on timekeeping
0
HarperElectricLogo
LOCATION

Justin, Texas

CONTRACTOR TYPE

Specialty

TRADE
MMR Group

MMR Group Increases Payroll Accuracy and Saves 20+ Hours Weekly on Semiconductor Project

CASE STUDY

MMR Group Increases Payroll Accuracy and Saves 20+ Hours Weekly on Semiconductor Project

hours saved weekly in payroll corrections per project
0 +
hours saved annually in payroll administration per project
0 +
in payroll admin costs saved annually per project
$ 0 K
employees managed on-site per
Syber Concrete & SmartBarrel Case Study Hero Image

How Syber Concrete Forming Stopped Time Discrepancies in Its Tracks and Saved $1 Million

CASE STUDY

How Syber Concrete Forming Stopped Time Discrepancies in Its Tracks and Saved $1 Million

saved in one year by eliminating time discrepancies
$ 0 M
reduction in payroll processing time
0 %
reduction in manual timekeeping for subcontractors
0 %
fewer payroll errors
0 %
LPL Solar & SmartBarrel Case Study Hero Image

How 100% Accurate Time Tracking Drove Worker Accountability to Save $7,500 per Foreman Annually

CASE STUDY

How 100% Accurate Time Tracking Drove Worker Accountability to Save $7,500 per Foreman Annually

saved per foreman annually
$ 0
admin time saved per year
0 +
employees can check in on SmartBarrel in under 15 minutes
0
minutes time approval process per foreman
> 0
Zone 4 & SmartBarrel Case Study Hero Image

Zone 4: Saving Thousands per Jobsite and Enhancing the Subcontractor Relationship with Better Time Tracking

CASE STUDY

Zone 4: Saving Thousands per Jobsite and Enhancing the Subcontractor Relationship with Better Time Tracking

Hours saved annually
0
Reduction in subcontractor payment processing time
0 %
Accuracy in time tracking achieved
0 %
Hours per project cycle saved
0
logo

Zone 4 Systems Integration and Design

CSS Solar & SmartBarrel Case Study Hero Image

CSS Solar Reduced Payroll Costs by 20% and Eliminated Time Theft

CASE STUDY

CSS Solar Reduced Payroll Costs by 20% and Eliminated Time Theft

reduction in payroll costs
0 %
saved per worker per month
$ 0
less time in payroll admin
0 %
saved in labor spend per month
$ 0 K
v4-modified-01-150x150

CSS Solar is a state-licensed contractor

Axcon & SmartBarrel Case Study Hero Image

Better Time Tracking with SmartBarrel, Axcon’s Secret Weapon to Winning 5% More Bids

CASE STUDY

Axcon’s Secret Weapon to Winning 5% More Bids: Better Time Tracking With SmartBarrel

saved per worker per month
$ 0
admin hours saved per year
0 +
increase in Bids Won
+ 0 %
saved in wages per month
$ 0 K

Axcon is a service company

Alphabet Construction & SmartBarrel Case Study Hero Image

How Alphabet Construction Cut Payroll Time by 60% and Saves $40K With Verified Hours

CASE STUDY

How Alphabet Construction Cut Payroll Time by 60% and Saves $40K With Verified Hours

less time spent on super timekeeping
0 %
reduction in payroll processing time
0 %
saved annually from reduced admin and accurate hours
$ 0 K+
elimination of time theft
0 %
Kiewit & SmartBarrel Case Study Hero Image

How Kiewit Saved $5,000 Per Day With SmartBarrel’s Attendance Tracking

Challenge

The Kiewit safety team needed to know who was on site during the rehab of the Washington Metro’s Yellow Line tunnel. With 24-hour activity on the site and multiple construction entrances to the project, a paper sign-in process was not up to the task.

Solution

By deploying SmartBarrel devices